Hampton by Hilton, Bridge Street, Leeds

Hampton by Hilton, Bridge Street, Leeds

Hotels

Hampton by Hilton, Bridge Street, Leeds

The project comprised of the conversion, refurbishment and extension of a 12-storey office building into a 3* Hampton by Hilton hotel. The hotel provides a total of 192 bedrooms.

The building is heating and cooled via VRF heat recovery ventilation systems, with local MVHR ventilation to all bedrooms with air filtration to improve Indoor Air Quality. The building is provided with full fire sprinkler coverage.

CDL were responsible for developing the MEP design proposals at RIBA Stage 4 Technical design through to Stage 6.

Project Gallery

2019 11 18 09.26.19
2019 11 18 11.10.11 (custom)
2019 11 18 09.30.08 (custom)
2019 11 18 10.07.52 (custom)
2019 11 18 10.21.01 (custom)
2019 11 18 09.26.39 (custom)
2019 11 18 10.23.53 (custom)
2019 11 18 09.34.09 (custom)
2018 02 13 11.36.29 2

Project Details

Lead
Craig Degnan
Client
Robertson Engineering Services
Timeline
Started: 2018
Completed: 2020
Category
Hotels
Project Value
£13,000,000